Widening Al Garhoud Bridge

Project Description

  • Widening Al Garhoud Bridge by replacing the existing bridge with a new one
  • Constructing two bridges; each of them has 7 lanes at each direction
  • The total length of the bridge is 520 metres with structures rising 16 metres above the water level


Project Benefits

  • Ensures free navigation in the Creek
  • Provides additional traffic capacity as it will be capable of handling 16000 vehicles per hour

Leave a comment

Your Name
Email address
Comments

Submit

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.