The project includes the design & construction of the internal road network in Nad Al Shiba fourth (District No. 617) with a length of 50 km and apart of Nad Al Shiba First (District No. 618) with a length of 6 km, which brings the total road length to (56) km. the collector road width to be 7.3 meters along the carriageway and the local road width to be 7.0 meters along the local road carriageway.
Additional 2.50 meters width to be provided at parallel parking locations. The project also includes the design & construction the street lighting, storm water drainage works and other utility services as per the requirements of the authorities.
Project Code: R1009
If you have any questions, don’t hesitate to ask us
Communicate with us via any of the following channels
Copyright © 2022 Roads and Transport Authority, all rights reserved.
This site is maintained by the Roads and Transport Authority.
The site is best viewed using IE10 and above, Mozilla Firefox, Safari and Chrome.
Page last modified:
Content loading ...
Please wait for a moment