Two footbridges on Ras Al Khor Road

Project description 

 

  • The two bridges are characterised by attractive designs and are fitted with hi-tech electromechanical systems, alarms, firefighting, remote monitoring systems, and dedicated bike racks. 

 

The first bridge
 

  • Links Creek Harbour and Ras Al Khor Industrial Area
  • It is 174 metres long and 3.4 metres wide in the first section, and 4.1 metres in the second section, and rises 6.5 metres above the asphalt and encompasses two 120-metre-long ramps, each 1.9 metres wide for cyclists

 

The second bridge 

  • Located on Ras Al Khor Road, directly across Marhaba Mall and Wasl Complex in Nadd Al Hamar
  • It is 101 metres long, 3.4 metres wide, and 6.5 metres high from the asphalt, with two ramps on either side , each spanning 120 metres in length and 1.9 metres in width
  • Electromechanical system rooms that hold alarm and firefighting systems, as well as remote monitoring systems. 

 

Project benefits 

  • Enhances traffic safety
  • Provides safe mobility means for pedestrian crossing
  • Fosters wellbeing to bring more happiness to residents and visitors of Dubai
     

Leave a comment

Your Name
Email address
Comments

Submit

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.